Southwestern Public Service Company (SPS), an operating company subsidiary of Xcel Energy Inc., is issuing this All-Source Request for Proposals (RFP).

This All-Source RFP is the next step in our regulated process to secure and invest in a diverse portfolio of economic generation to benefit customers. SPS will evaluate submissions with proposed commercial operation dates within or before May 1, 2028, to May 1, 2030.

The model RFP document and associated appendices containing the bid forms, model power purchase agreements, ownership technical specifications, term sheets, and other related information are available through the links below.

RFP Document
SPS All-Source 2024 RFP (PDF)

Appendix A – SPS’s Build-Transfer Term Sheet

Appendix B – SPS’s Model PPA Templates

Appendix C – SPS Resource Technical Requirements

Appendix C - SPS – Renewables

Appendix D – Load Forecast

Appendix E – Point of Interconnection for Transmission-Interconnected RFP Projects

Appendix F – Bid Forms

Appendix G – Protective Order

Appendix H – Subcontractor Plan

RFP Schedule

Activity Date
RFP Issuance July 22, 2024
Bidder's Conference August 27, 2024
Notice of Intent to Respond Due December 10, 2024
Proposals Due January 3, 2025

Bidder's Conference

Date & Time: Friday, August 27, 2024, at 10:30 AM Central Time
Location: 790 S Buchanan, Amarillo, TX 79109

Online Attendee Link:
Pre-Bid Meeting Online Attendance (external link)
OR
+1 469-965-2487 United States, Dallas (Toll)
Conference ID: 753 999 121#

 

The bidder’s conference will be hosted online and in-person at 790 S Buchanan, Amarillo, TX 79109, 4th Floor Bay 1. In-person attendees will need to check in with Xcel’s building security for a visitor badge and will need to be escorted by an Xcel employee from the building’s 4th floor lobby starting at 10:00 A.M. Central Time (CT), for the 10:30 A.M. CT, August 27, 2024, meeting. The live meeting broadcast will be recorded and available through the same webcast link above.

Notice of Intent to Respond (NOIR)

Respondents who intend to submit a proposal(s) into the 2024 All-Source solicitation must submit a Notice of Intent to Respond (NOIR), located in the Appendix F above, by the stated deadline. The NOIR will serve as registration for the All-Source Solicitation and should be submitted via email to the RFP Project Manager at the earliest date possible but no later than 4:00 P.M. Central Time at the date in the RFP Schedule above. There is no fee required to submit a NOIR. Upon receipt of a bidder’s NOIR, the Company will respond to the bidder with a link that will enable them to submit their bids electronically to a secure file sharing site and wiring instructions for submittal of bid fees. Respondents who fail to submit a NOIR will not be able to submit bids. The Company notes that bid and fee submittal are electronic only and physical copies or checks will not be accepted.

Proposal Submission Deadline

Proposals will be accepted until 4:00 P.M. Central Time on the date referenced in the above RFP Schedule. In the 2024 All-Source Solicitation, all proposals will be submitted electronically via a secure, confidential file upload application (XpressDRIVE). As noted above, a link will be provided to bidders via email after submission of a NOIR that will allow them to upload bids to the XpressDRIVE prior to the submission deadline.

Proposals received later than the submission deadline will be rejected and unopened, unless the Company determines, in coordination with the Independent Monitor, to consider such proposals. Any bidder submitting proposals after the submission deadline should immediately send an email to SPSRFP2024@XcelEnergy.com documenting why the proposal was submitted late.

Each individual bid package should be submitted as a single .zip file with completed bid forms in executable format. Bid Form I, executive summaries and Narrative Topics should be submitted in .pdf format. To assist the Company in its eligibility screening and due diligence reviews, bidders are strongly encouraged to combine as much of their written proposal material into a single, cohesive.pdf file as possible.

Communication Protocol

The primary point of contact for all communications between the Company and potential bidders is the RFP Project Manager. This individual may be contacted at SPSRFP2024@XcelEnergy.com. All communications with the RFP Project Manager must also carbon copy (“cc”) the independent monitor at the address,IM-SPS2024@acciongroup.com.

Information regarding the RFP will not be provided via telephone inquiries or inquiries from any email other than to/from the RFP Project Manager.

Frequently Asked Questions

FAQ (XLSX)

Energy Saving Tip Icon

Energy Saving Tip

Have your home checked for leaky ducts, drafts around doors and windows, fireplace dampers, and other places where air might escape.

chat bubble logo

Break Ground, Not the Law

Always call 811 before digging in your yard to avoid hitting buried gas or electric lines. Not only is it the safe thing to do, but it's the law.